Other than the iconic Loop Trail, the South Beach Trail (SBT) in Discovery Park is the most popular trail segment in the park. Each year, more than 250,000 people hike the SBT. Upon entering it, you feel as if you are in the mixed hardwood and coniferous forests of the Cascades, except you also have periodic views of Puget Sound and the Olympic mountains. Visitors descend through forest and bluff to the spectacular South beach. As wonderful as this experience is, it won’t be there forever without revisions to the trail. Parts of the trail have fallen into disrepair, and other parts are threatened by slope instability.

Recognizing the deteriorating conditions, in 2018, Friends of Discovery Park (FoDP) initiated evaluations of the South Beach Trail. In 2024 FoDP offered to donate $50,000 of our own funds toward improving trail safety, including rerouting portions of the trail to more stable terrain and bypassing the badly eroded stairs that were built more than 50 years ago. The SBT is one of many popular pathways at Discovery Park—learn more about the Park’s trail system.

Project updates will be posted here as they become available. SPR plans for construction in 2027.

The following is a timeline of the South Beach Trail evaluations, reroute design, construction, and grant applications.

South Beach Trail
Puget Sound is visible from the South Beach Trail but portions of the trail are experiencing deteriorating conditions. Photo by Marcus Donner

March 2018

South Beach Trail 1 (3)
Photo by Marcus Donner

Geotechnical

FoDP hires geotechnical consultant, Shannon & Wilson, Inc. to perform a preliminary evaluation of the existing trail conditions and potential new routes for the South Beach Trail.

December 2018

Trail routes evaluated

Seattle Parks & Recreation (SPR) hires landscape architect, J.A. Brennan Associates, to evaluate new trail routes with Shannon & Wilson, Inc. as a subconsultant.

Spring 2019

Sbtmeetingsurvey

Public meetings

J.A. Brennan Associates and SPR hold two public meetings about the new trail routes at the ELC. 

May 2019

Geotechnical reports

Shannon & Wilson, Inc. completes a geotechnical report on the J.A. Brennan preferred route. 

October / November 2020

Earthcorps South Beach Trail Img 2083
Earthcorps constructing the upper strairs. Photo by Bill Laprade

Phase 1 construction

EarthCorps, under contract to SPR, completes construction of Phase 1, the upper 400 feet of the new trail alignment. This includes 25 steps at the upper trailhead.

October 2022 

First grant proposal

SPR submits grant application to the Washington Recreation and Conservation Office (RCO) Recreational Trails Program (RTP) for the remainder of the new South Beach Trail (Phases 2, 3a, and 3b).  Total project estimate is $420,000, and SPR asked for $150,000 from the RCO RTP.

April 2023

Grant unsuccessful

The RCO RTP grant application is not successful.  SPR’s application for funding ranked no. 25, primarily falling short in SPR’s degree of matching funds.

May 2024

Fodp Logo Green

FoDP pledges $50,000

Friends of Discovery Park sends a letter to SPR pledging $50,000 toward the completion of the new South Beach Trail, with the condition that the money would be transmitted upon SPR’s official project approval and SPR’s consummation of a contract for construction of the South Beach Trail Relocation Project. 

October 2024 

Second grant proposal

SPR submits a second grant application to the RCO RTP for the remainder of the new South Beach Trail (Phases 2, 3a, and 3b).  Total project estimate is $420,000, and SPR asks for $150,000 from the RCO RTP.

March 2025

Second proposal unsuccessful

The second RCO RTP grant application is not successful.  SPR’s application for funding ranked no. 16,  and was listed as an alternate; in the event additional grant funds became available.  They did not.

June 2025

Dpsbt Schematic Plan 2019 7 22
Schematic Design by J.A. Brennan

Trail layouts and routes

SPR hires J.A. Brennan Associates to confirm the trail layout and prepare design documents for the remainder of the new trail (Phases 2, 3a, and 3b), and to flag the new route in the field with SPR. See a larger view of routes below.

January 2026

South Beach Trail 1 (1)

Project funded

SPR has told FoDP that “The project is fully funded, and we (SPR) are working on permits in the coming months to plan for construction in 2027.”